Danish Research Consortium for Wind Energy
May 27-28th 2013, Wind Energy Conference, Trinity, Fredericia, Denmark. Join the Danish Wind Power Research conference in May 2013. The conference is the natural meeting point between researchers and industry and will focus on wind technology development and offshore deployment.
Research-driven:
The conference is organized by the Danish Research Consortium for Wind Energy which consists of the Technical University of Denmark, Aalborg University, Aarhus University, DHI Group, Delta and Force Technology. The main content of the conference will be results from new Danish national wind energy research projects. There will be opportunities to hear how the influence of the economic crisis has challenged the research institutes and where the offshore developments will be focused in the next 5 years.
Proud history:
The conference takes over the yearly conference which was arranged by the former Danish Society for Wind Energy. The event thus has a track record of 8 conferences between research and industry since 2003.
Main audience:
The target group for the conference is representatives from the wind industry, and related industries; the offshore sector; researchers from Danish and foreign countries; PhD students; developers of wind energy projects and authorities. The purpose of the conference is to exchange knowledge and to disseminate research results and research needs. The conference language is English.
Interim Program
Monday May 27th - 2013
08.30 Registration
08.50 Welcome
09.00 Key note speaker from industry
09.20 Wind resources, siting and external conditions
10.40 Coffee break
11.00 Aerodynamics, aero elastic design and aero acoustics
12.20 Lunch
13.20 Structural design, materials and machinery components
14.40 Short Ph.D. presentations
15.40 Coffee break
16.00 Presentation of Research Groups within the Wind Consortium (6 parallel sessions with presentations and discussion).
17.40 Ph.D. poster exhibitions, Reception and networking
19.00 Buffet dinner
Tuesday May 28th - 2013
08.40 Opening remarks
08.50 Electrical components and electrical systems (grid connection, standards and regulation)
10.10 Coffee
10.30 Integration (energy systems, grid impact)
11.50 Lunch
12.50 Offshore wind energy, operation and wind farms
14.10 Economy, public acceptance, environment, noise etc.
15.30 Concluding remarks
15.40 Farewell coffee
Practical Information
Venue:
Trinity Hotel & Konference Center
Gl. Færgevej 30
Snoghøj
7000 Fredericia
+45 8227 1717
http://www.trinity.dk/
Price:
- Entire conference incl. dinner and accommodation: DKK 3800
- Entire conference incl. dinner and excl. accommodation: DKK 3200
- 1 day conference excl. dinner: DKK 1800
- Register before March 5th and get the early bird discount – DKK 100 pr. day.
- Discount for students and Ph.Ds.
See registration form for full details and to sign up.
http://forms.dtu.dk/Wind/DFV/DFV_registration_org.asp
After April 26th accommodation must be booked directly at the hotel.
For more information contact:
Kamilla Fugleberg
kaal(at)dtu(dot)dk
+45 4677 5558
Pernille Daub
daub(at)dtu(dot)dk
+45 2012 3342
- MARE-WINT Book released: MARE-WINT New Materials and Reliability in Offshore... (12.09.2016)
- South Baltic Center of Offshore Wind Energy BALTECO (29.09.2015)
- Opening of the Energy Conversion and Renewable Energy Centre (24.09.2015)
- Offshore Wind Farms - From Planning to Decommission (12.08.2015)
- Floaters ‒ Game Changers for Offshore Wind? (26.03.2015)
- Wind turbines take to the skies to seek out more power (05.03.2015)
- Longer Blades and New Materials Affecting Wind Industry, Report Says (03.03.2015)
- Norwegian, Australian Scientists Collaborate on OW Foundations (27.02.2015)
- Offshore Wind Cost 11% Lower, Report Says (27.02.2015)
- Siemens to Present Cost-Cutting Innovations at EWEA Offshore (27.02.2015)